Buildings that are finished on the day we promised.

ATF Developer is a residential developer and general contractor in Połczyn-Zdrój. We take a plot of land from the first survey through permits, construction and handover — with one team responsible for the whole of it.

Registered company, insured works, fixed-price contracts

12+ Years of combined site experience
40 Residential units delivered
100% Projects handed over with a signed protocol
5 yrs Structural warranty on everything we build

About the company

A small developer that answers the phone

ATF Developer Sp. z o.o. is based on ul. Słoneczna in Połczyn-Zdrój and works across Zachodniopomorskie. Our registered activity is PKD 41.10.Z — the development of building projects connected with the erection of buildings. In practice that means we buy or take on land, prepare the design and permits, build, and hand the keys over.

We deliberately run a small number of projects at a time. Every client deals with the person actually managing the site, not a call centre, and every stage is priced and scheduled in writing before work starts.

Our crews are directly supervised, our subcontractors are people we have worked with for years, and the materials we specify are the ones we would use in our own homes. If something on site changes, you hear it from us first.

“We would rather tell a client that a stage will take three weeks longer than discover it together at the end.”
Site management, ATF Developer

Company details

The registered information you may need for contracts and due diligence.

Legal name
ATF DEVELOPER SP. Z O.O.
Registered office
ul. Słoneczna 2b, Połczyn-Zdrój, Poland
Main activity (PKD)
41.10.Z — Development of building projects
NIP
0000000000
KRS
0000000000

Services

What we take on

From a single house to a full residential building — as the developer, the general contractor, or both.

Residential development

We acquire the plot, run the design and permitting, build, and sell finished apartments and houses with clear contracts.

General contracting

One contract, one schedule and one point of responsibility for the whole build, including every subcontractor on site.

Shell and core construction

Foundations, structure, roof and façade built to the design, ready for you or your own fit-out team to continue.

Design and permits

Architectural and structural design coordinated with surveyors and the local authority, through to the building permit.

Renovation and conversion

Modernising older buildings in and around Połczyn-Zdrój — from structural repairs to full thermal upgrades.

Investor supervision

Independent site inspection, progress reporting and cost control if you already have a contractor in place.

Why choose us

Fewer surprises, in writing

The things clients tell us mattered most after the build was over.

  • Fixed price before we start

    A full bill of quantities is agreed up front. Changes only happen when you approve them in writing.

  • Insured and warranted

    Full contractor liability insurance, and a five-year warranty on the structures we put up.

  • Local to Połczyn-Zdrój

    We know the ground conditions, the local planning office and the suppliers who deliver on time here.

  • Weekly progress reports

    Photographs, completed items and the next week's plan, sent every Friday for as long as the site is open.

  • Schedules we can defend

    Dates are planned against real crew and material availability, so the handover date means something.

How we work

Five stages, start to keys

Every project follows the same order, so you always know what comes next and who is responsible for it.

Talk to us about your plot

  1. Site visit and brief

    We walk the plot with you, check access, ground and utilities, and agree what you actually want built.

  2. Design and permits

    Architectural and structural drawings are prepared and submitted, and we handle the authority correspondence.

  3. Costing and contract

    You receive a priced bill of quantities and a stage-by-stage schedule before a single machine arrives.

  4. Construction

    Groundworks through to façade, supervised daily, with a written report at the end of every week.

  5. Handover

    Joint inspection, snag list closed out, documentation and warranties signed over to you.

Contact

Tell us about the project

Send the basics and we will come back to you within one working day with the next step — usually a call and a site visit.

ul. Słoneczna Połczyn-Zdrój
ul. Słoneczna 2b, Połczyn-Zdrój — parking on site.